Plumbing for my aquarium actually started while the house was getting
built. I knew exactly where the aquarium was going, and exactly
where the filtration closet would be, but was left with one problem.
The builder would not put hot/cold water and a sewer line in the
closet for me. Oh well, I figured, I'll do it myself. My father
came down and after the day crew left we snuck into my house and
did a little plumbing of our own.

That's my father. He sits where my kitchen sink is now. That's
the sewer line and water lines coming in for the sink and the lower
copper pipe to his left was existing for my refrigerator. Two stubs
of copper are seen above the fridge line, originating from the closet.

To the left of the my father is the closet. Of course once we completed
the project I received a phone call from the builder the following
morning. He was rather ticked at me for doing that and he ripped
out everything we did. He said he was going to charge us for the
labor, but never did. He also instructed me to stay out of the house
from here on in because it wasn't my house until closing. That sucked
because the following night I was planning on returning to run my
wiring for my 7.1 Surround Sound. Now I had to do that the hard
way, not to mention reinstall the water lines and sewer.
To continue on with the project move
along to the closet.
Delivery Day
~ The Plumbing
~ The Closet~
The Stand ~ The
Tile ~ Move In
~ The Canopy ~
Filling
Top of Page